Topographical Surveys (Installation of Ground Monitoring Points) – in order to gather more information on the existing railway corridors along the MCJ line and OXD line we will be conducting drone surveys (see map below). These will fly at a minimum of 80 metres and will be largely indistinguishable other than to the pilots and support. Ahead of these surveys we need to install ground monitoring points. In order to do this safely whilst no trains are running we have requested railway possessions for the dates below. Not all of these dates will be used. The works will involve two gangs of 4-5 people and will only use hand tools and a rail trolley to move equipment up and down the rail.
- Saturday 23rd March & Sunday 24th March
- Saturday 30th March & Sunday 31st March
- Saturday 6th April & Sunday 7th April
- Saturday 13th April & Sunday 14th April
- Saturday 20th April & Sunday 21st April
- Saturday 27th April & Sunday 28th April
- Saturday 4th May & Sunday 5th May
- Saturday 11th May & Sunday 12th May